The first 15 speakers were built yesterday (couldn't get started until noon), we expect to produce around 25-30 per day, more as the process streamlines.
I have 265 speakers on back order, so that will take 8-10 days to get those caught up and built. I am building/shipping them in the order they were paid/ordered, which is only fair to those who have waited the longest. I am not going to have a room at the LA AMP Show, there just wasn't enough time to build 24 speakers, break them in and load them into cabs with two days to go before loading up on Friday.
I am going to have two 4x12 cabs at the Freidman Amps/Tone Merchants room. There will be four M75 16 ohm 65w and four of the new BlackBack version BM75-16 65w in each cab. I will also have a Scumnico loaded 1x12 at the Tungsten Amps room with Adam Palow.
After the back orders are caught up, I will have another 100 built for stock of my most popular models, so that order times will decrease dramatically.
My second order of frames (480) arrive in late October, now that I have the frame pipeline going.
Here are some pics of the new production models below. Many thanks to the Scumback clients who have waited for their orders through the transition period!